Results 101 to 120 of 313
Thread: Project: SCHEVY 2001 Silverado
Hybrid View
-
12-30-2008 #1
Grabbed another sheet of 3/16"

Built my upper link mounts, going to gusset behind them otherwise they are basically done







As you can see here the holes I drilled on a 25" radius (same as bar length) no need to re thread as I adjust my bar angles

Nick Schiffer
2001 Silverado
Currently Fabricating Full Tube Chassis
Special Thanks to:
Air Ride Technologies - Wilwood Engineering
...back in the day






Reply With Quote