Enter your username:
Do you want to login or register?
  • Forgot your password?

    Login / Register




    Results 1 to 20 of 44

    Hybrid View

    1. #1
      Join Date
      Sep 2009
      Location
      Arizona
      Posts
      446
      Quote Originally Posted by andrewb70 View Post
      Jason,



      I've worked with Frank in the past and he runs a very good operation.

      Please WOW me with this set-up. You are going to charge the sum of a down payment on a house for a rear suspension setup. Please tell me how awesome it will be. Please tell me something more about it. Please tell me what "modified" C6 geometry means. I know the C6 is a great car, but how will its rear geometry work when it is combined with a custom chassis and a non-C6 from suspension. Please tell me how it is better than anything else on the market today...Please...

      Andrew

      Please keep in mind that the price range was only an estimate, It can possibly be thousands more once were said and done. The rear hubs along are going to be 2K plus then you have to remember that we also have 1600 in shocks / springs etc...

      AS for the geometry, we do not have the "kits" finalized. As it looks right now we are going to have 2-3 basic rear bulkhead sections. These will be very similar in geometry but different WMS measurements for the different platforms.

      The two main WMS measurements we have discussed as a "must" to fit the majority of the market will be applicable to a early Nova and Gen1 Camaro. Those two WMS measurements see to cover the majority of the market.

      The setup is still only in the design / setup phase. The pictures you see are for a "one-off" chassis with VERY specific requirements. The actual "kits" we plan to produce are going to look slightly different and have different WMS measurements.

      As for the geometry, I dont know if we will disclose any information about what was changed or the actual location changes, once we get to that point I will categorize the information and make a decision on what we are willing to disclose.

      Please be patient, we are far from a serious final product.

      Thanks
      Jason


    2. #2
      Join Date
      Sep 2009
      Location
      Arizona
      Posts
      446
      Still moving forward. There is a large amount of design / fabrication involved with this specific project so some elements are taking time to complete. In other words... im only one man!

      Center section getting closer!





      Jason

    3. #3
      Join Date
      Sep 2009
      Location
      Arizona
      Posts
      446
      Getting closer.



      Jason




    Advertise on Pro-Touring.com