Enter your username:
Do you want to login or register?
  • Forgot your password?

    Login / Register




    Results 1 to 20 of 156

    Threaded View

    1. #10
      Join Date
      Feb 2011
      Location
      Kentucky
      Posts
      113
      We finally got our frame bolted to the frame jig. Everything needs to be leveled, squared up, and locked down and there are several other stations that need a bit more fabrication but we're absolutely stoked to see it sitting up there!

      One of the ways I justified building the jig (to myself) is that I needed welding practice before putting the TIG torch to the Chili Pepper's frame. It has definately helped and I have gained enough confidence that I am now pretty comfortable doing the welding on the frame myself.




      Tom Tomlinson
      Holley





    Advertise on Pro-Touring.com