Results 1 to 20 of 30
Thread: Project Silverback
Hybrid View
-
04-16-2015 #1
Registered User
- Join Date
- Jun 2006
- Location
- Indianapolis,IN
- Posts
- 1,605
We have clearly been behind the ball with these project updates. Here are some updates, we got the completed frame from Roadster Shop and it looks amazing. It has since been power coated and is in the process of being built back up with Bear brakes with Roadster Shop edition 6-piston calipers. It has also been fitted with Penske triple adjustable coil overs. The floors in the car needed some work so we cut them out and installed a nice clean pan. The trunk was also replaced but needed some modifications to allow the frame to fit correctly. The motor has been stroked and fitted with a F.A.ST. intake and is now making 680 H.P. The one off forglines are on there way, stay tuned for updates!
-





Reply With Quote



