Enter your username:
Do you want to login or register?
  • Forgot your password?

    Login / Register




    Results 1 to 10 of 10

    Thread: Round Two

    Hybrid View

    1. #1
      Join Date
      Aug 2004
      Location
      Caledonia, MI
      Posts
      451
      Country Flag: United States
      I've been slacking on my thread updates. Since the last round of pictures I got tubs, cross member, and QuadraLink brackets welded in. Last week I took the car down to Joe and Paul VanNus at DutchBoy Hot Rods. They got started on the car on Monday and got more done in four days than I would have in a month and a half. My phone was stolen a couple of weeks ago so there is a big gap in pictures. These are mostly pictures that Paul has been sending me of the progress.

      I am also including some pictures of the engine harness that I am building for Paul's LS3 swap.











      Spatter paint done and cleared









      Upol Rapter liner going on the floor.





      Here are some pictures of Paul LS3 harness. It will be a two piece harness, so the engine can be pulled without having to unplug every connector. I'm hoping to have at least the engine side of the harness done by next week.













      We are heat shrinking the entire harness and not using loom. This is flame and chemical resistant heat shrink. This is the first branch of the harness I have finished.




      Jason Mitchell
      1969 Camaro @ Dutchboys





    Advertise on Pro-Touring.com