Enter your username:
Do you want to login or register?
  • Forgot your password?

    Login / Register




    Results 1 to 3 of 3
    1. #1
      Join Date
      Aug 2004
      Posts
      567

      Nova project pics

      Got the minitubs all in and welded, now on to welding the quarters, tailpanel, and rockers. Also the subrame is assembled.



    2. #2
      Join Date
      Jul 2002
      Location
      Muskegon, MI
      Posts
      4,494
      Turned out great!!! Nothing more refreshing than new metal and fresh assembled sub frame. What control arms are those? I see stainless steel in those control arms.
      Adam_______Offical Car Name "ILLUSION"
      383 Stroker, Stock cast heads, T-56 tranny, 4.11 gears, 2002 T/A dash, 4th gen interior including seatbelts, power lumbar seats, 18" Budnik Wheels, Hydraboost, QA1 shocks, DC Controller, Power steering conversion, fuel cell, unique exhaust set up........
      ILLUSION Website-----------Old Website--------------My Car on Lateral-g.net----------- Need something designed?-AdFabDesign

    3. #3
      Join Date
      Aug 2004
      Posts
      567
      They are Speedtech's


    Advertise on Pro-Touring.com