Results 1 to 20 of 43
Thread: Winter Body Work Progress
Threaded View
-
01-25-2011 #20
Registered User
- Join Date
- Jan 2009
- Location
- Rochester, NH
- Posts
- 54
I have 10 days of leave and get to work on the car around the "Honey-do's"... Still excited that she's home. A couple pics :
Loading onto the trailer for the trip:

Loaded and ready to go:

At home today with some "bling" back on:

A little new bling on the outside to pull together the LS3 theme:

Dyna mat and some wiring got installed last night:

The engine bay:

The front minus the headlight stuff:

Derrick1969 Camaro, LS3, Air Ride, Baer Pro 6S disc brakes, 19"/20" Rushforth wheels, Dana 60, etc.
Pictures : http://s330.photobucket.com/albums/l...20Down%202010/
2008 Charger SRT-8 SuperBee / 2008 Dodge RAM 2500 / 2006 Cadillac SRX
-





Reply With Quote



