Enter your username:
Do you want to login or register?
  • Forgot your password?

    Login / Register




    Results 41 to 60 of 87

    Threaded View

    1. #10
      Join Date
      Mar 2003
      Location
      Fallston, MD
      Posts
      564
      Tyler, Thing sure have changed alot since I talked to a month or two ago. Glad to see you guy decided on the forgings instead of making them from solid "billet" Blanks. This will pay off in the long run price wise compared to the cost of the machine time from solid. I never took very good records of my time when I made the spindles for II Much But I figure it was around 40 hours apiece. That time could be drastically cut if I had production level machinery and made some special tooling. But with your forgings I don’t think you will have more than one-hour machine time into them if that. I have set of cast stainless up rights for the JPIFS that I have yet to machine and I cant see why it would take any more that one hours machine time a piece to get these done.



      Good luck I cant what to see them

      Brian





    Advertise on Pro-Touring.com