Results 1 to 5 of 5
Thread: Quarter Panel ?
Hybrid View
-
04-11-2005 #1
Banned
- Join Date
- Aug 2003
- Location
- Orlando, FL
- Posts
- 8,745
It should be 12 to 15 hours per side, and about 8 hours for the rear body. if outer wheel houses are to be installed, add another few hours per side.





Reply With Quote