Enter your username:
Do you want to login or register?
  • Forgot your password?

    Login / Register




    Results 1 to 20 of 21

    Threaded View

    1. #1
      Join Date
      May 2007
      Location
      Houston, Tx
      Posts
      2,200
      Country Flag: United States

      How much time does it take?

      I have found somebody who is willing to do all of the body work that I want done in exchange for my motorcycle. I know how much my bike is worth so I want to make sure I get the most work done for the trade. My question is how much time does it take to do most of this work? I am not looking for an exact time but a range. He is gonna do the following work:



      LH/RH lower quarters replaced
      tail panel replaced
      floor pans replaced
      fire wall smoothed
      drip rails shaved
      mini tubs installed
      dash replaced
      fabricate the trunk to accommodate a fuel cell
      fabricate the transmission tunnel to fit a t56
      fabricate the rear end of the car (in the attached image you can see what is going to be done)

      thanks for any help you guys can offer me guys!!
      Attached Images Attached Images  
      Last edited by Young Gun; 07-27-2008 at 09:58 AM.
      Colin Russ





    Advertise on Pro-Touring.com