Enter your username:
Do you want to login or register?
  • Forgot your password?

    Login / Register




    Results 1 to 15 of 15

    Threaded View

    1. #1
      Join Date
      Apr 2015
      Posts
      95
      Country Flag: United States

      Driveline setup during fab phase

      I知 hoping some experts can chime in. Project details:
      - 67 Chevelle with LS/T56 swap
      - Hellwig Framefx brace kit
      - Holley eng and trans mounts
      - original 12 bolt with adjustable upper arms
      - no driveshaft yet

      I知 at a point where I need to weld in my transmission crossmember mounts and want to make sure I have the eng/trans at an acceptable angle. Understand the T56 will need to be raised substantially and the tunnel sheet metal will be cut. Problem I知 having is ensuring the transmission crossmember mounts are welded in at an acceptable height (especially with no driveshaft yet).


      Would it be best to mock everything in place and measure for a driveshaft first? Or set the trans output angle and diff pinion at or near 3 deg?



      Thanks in advance for an insight on proceeding !





    Advertise on Pro-Touring.com