Enter your username:
Do you want to login or register?
  • Forgot your password?

    Login / Register




    Results 1 to 1 of 1

    Threaded View

    1. #1
      Join Date
      Nov 2009
      Location
      Crete Illinois
      Posts
      97
      Country Flag: United States

      Delivery Times for the following Parts

      I am building a 69 camaro and was wondering how long of a lead time I should allow for delivery of the following parts:

      G-Link rear suspension

      Narrowed Fabrictated 9 inch housing with axles and bearings.

      13 inch Wilwood fronts with 12" wilwood rears


      GM 600 powering sterring box


      I would like to have the car ready to ship to the painter by September which is a tight schedule considering I have a day job. Any idea of allowable delievery times is greatly appreciated.


      thanks

      Larry Bellar
      Crete Illinois



    Advertise on Pro-Touring.com