I will need a couple nights at the watering hole after the challenge I have just taken on.
For all you guys with a list of things to do before you can show I thought I would throw in what I have to do to get my car together enough to come out.
Paint Car (It is in polyester primer now and needs multiple block sandings and multiple coats of primer followed by the base and clear
Swap out engine
Install all new shocks and springs
Design and build new head light door motor system
install custom carpet
Wire up gauges
Drop tank and install new filler neck
Mount new tires on rims once they arrive
Build roll bar
Prep and powder coat all window trim
Install glass
Hang doors, deck lid and hood after paint
install lights
misc 1000 other things
On top of the above I have my full time job along with project Kryptonite that I am painting now.
I am still not sure how I will get it done....I will be burning the midnight oil for sure.
Also to keep up my media whore status I will be working/filming on the set of Trucks TV the week of 3/22 to 3/26 for a special episode so those days are shot for the home projects.
Anyone know how to make the days longer?
Which car? corvette?
Days are getting longer as we approach summer.
Matt
Current project: " Chain Reaction "
A.K.A. " BIG " by wife, biatch in garage.
1969 RS Camaro L92 T56 Quadra-link, CW sub, Ford 9" a progressive build.