Results 1 to 20 of 32
Thread: Step up or Step off
Hybrid View
-
02-27-2010 #1
Yep work is work and we all understand that one and hopefully you'll catch another event as they truly are a gas to be at..... Now as for 400 miles,,, "put a pretty shawl over that sundress and lets ride" our motors are just warming up by then son LOL....
Carbon Kustoms Limited
A.K.A. Albert from Toronto
-
02-27-2010 #2We are all just pokin fun here and trying to give those who would be on the fence a little push.
My take on all this is you never know how long you got and the years keep coming and going. You should take every advantage to do the things you love and spend time with the people who make you happy.
Will driving across the states for a 1 day event be a PIA? hell yes. Am I going to spend money I shouldn't doing it? yep. Will it be worth it? You bet.Brian Finch
Pro-touring Hero
The Proof is on the Pavement
Sponsored by Baer Brakes, JRI Shocks, Pennzoil, Tremec, Magnaflow, Centerforce, AFCO Racing, Kurt Urban Performance, Amercian Powertrain, Forgeline, Holley, and of course BFG.
For the best engine money can buy please visit http://www.kurturbanperformance.com/
Authorized dealer for Baer, Ridetech, Detroit Speed, Vintage Air, Motorstate Distributing, Wilwood Engineering, American Autowire, Forgeline, Holley, Afco,
Contact brian@finchperformance for special Pro-Touring.com member pricing
www.hotrodtransformations.com
02-28-2010 #3Carbon Kustoms Limited
A.K.A. Albert from Toronto
02-28-2010 #4I will need a couple nights at the watering hole after the challenge I have just taken on.
For all you guys with a list of things to do before you can show I thought I would throw in what I have to do to get my car together enough to come out.
Paint Car (It is in polyester primer now and needs multiple block sandings and multiple coats of primer followed by the base and clear
Swap out engine
Install all new shocks and springs
Design and build new head light door motor system
install custom carpet
Wire up gauges
Drop tank and install new filler neck
Mount new tires on rims once they arrive
Build roll bar
Prep and powder coat all window trim
Install glass
Hang doors, deck lid and hood after paint
install lights
misc 1000 other things
On top of the above I have my full time job along with project Kryptonite that I am painting now.
I am still not sure how I will get it done....I will be burning the midnight oil for sure.
Also to keep up my media whore status I will be working/filming on the set of Trucks TV the week of 3/22 to 3/26 for a special episode so those days are shot for the home projects.
Anyone know how to make the days longer?Brian Finch
Pro-touring Hero
The Proof is on the Pavement
Sponsored by Baer Brakes, JRI Shocks, Pennzoil, Tremec, Magnaflow, Centerforce, AFCO Racing, Kurt Urban Performance, Amercian Powertrain, Forgeline, Holley, and of course BFG.
For the best engine money can buy please visit http://www.kurturbanperformance.com/
Authorized dealer for Baer, Ridetech, Detroit Speed, Vintage Air, Motorstate Distributing, Wilwood Engineering, American Autowire, Forgeline, Holley, Afco,
Contact brian@finchperformance for special Pro-Touring.com member pricing
www.hotrodtransformations.com
02-28-2010 #5





Reply With Quote
