Enter your username:
Do you want to login or register?
  • Forgot your password?

    Login / Register




    Results 1 to 7 of 7

    Hybrid View

    1. #1
      Join Date
      Aug 2007
      Posts
      86
      Put a piece of expansion foam in between the old slab and the new being poured. Frame out the front and sides, pour easily into space and float it. The reason for the expansion foam is to keep it a clean line across the two. It is really not necessary because the concrete can expand into the gravel, but it will give a nice clean line butting up the two.

      Dave






    Advertise on Pro-Touring.com