Results 1 to 7 of 7
Thread: Need Sheet Metal
Threaded View
-
11-28-2007 #6
When I cut the tunnel on my camino I just bought a set of front half floor pieces, welded the tunnel together, left some extra metal on it and used that as my new tunnel. It basically added a couple inches of height to it but it has the same shape with minimal fabrication. I think the floor pieces were $46 per side.





Reply With Quote



