Enter your username:
Do you want to login or register?
  • Forgot your password?

    Login / Register




    Results 1 to 20 of 862

    Threaded View

    1. #11
      Join Date
      Mar 2004
      Location
      Mid-Michigan
      Posts
      2,764
      Country Flag: United States
      I am only working 8's during the day so I am home by 3:30 or so. Tuesday and Wednseday evenings I spent designing and detailing the welding fixture for the UCA and getting the detail for the UCA done.
      Here is the UCA Detail

      This is the welding fixture detail.

      Tonight I worked on the jig for the UCA Ball Stud plate. This will locate the ball stud during fabrication. I got everything cut out and will get the side plates sized on the grinder tomorrow.
      Here are the parts laid out for cutting.

      Everything cut out and mocked up. I need to run the parts to size on the grinder but this is essentially what we have.


      The ball stud plate will be located with a couple of bolts while building the arms.

      If all goes well this weekend we'll have a complete set of control arms ready for final welding.
      Thanks for looking
      Mark

      Mark:
      "Bad Ast" Astro Van. Just because I did it... Doesn't mean it's possible...
      This my Bad Ast thread...
      https://www.pro-touring.com/showthre...roject-Faze-II
      This is my Fotki album...
      http://astroracer.fotki.com/





    Advertise on Pro-Touring.com