Results 1 to 20 of 51
Thread: Non-Touring Buggy project
Hybrid View
-
03-22-2006 #1
steering done except for tie rods, gauges tacked into place, motor dropped off at the machine shop, and alot more work to do.
68 Camaro - never to be finished
06 Silverado - Forged 370, L92 Heads, big cam, 4l80e ect. eventual donor for the above
http://www.youtube.com/watch?v=KmB2y7uX38I
-
03-25-2006 #2got the master cylinder mounted, built a brake pedal, extended the floors, built a batter bracket and almost finished the firewall today.
let me know what you think68 Camaro - never to be finished
06 Silverado - Forged 370, L92 Heads, big cam, 4l80e ect. eventual donor for the above
http://www.youtube.com/watch?v=KmB2y7uX38I
03-26-2006 #3That thing is sweet, I would love to be able to do the same thing, I keep an old 327 around the shop thinking maybe one day I'll build something like that.
Very nice, keep the updates and pics coming.
03-26-2006 #4Thanks a bunch JHunter
i wish i had the dart headed 327 from my camaro still, it would have been perfect for this too. oh well
got a lil bit more done today: Bottom of the console boxed in, battery mout finished, rear of the console boxed in, removable trans x-member finished, and everythign mocked into place.68 Camaro - never to be finished
06 Silverado - Forged 370, L92 Heads, big cam, 4l80e ect. eventual donor for the above
http://www.youtube.com/watch?v=KmB2y7uX38I
04-02-2006 #514" travel coilovers arrived and got a few more things done
68 Camaro - never to be finished
06 Silverado - Forged 370, L92 Heads, big cam, 4l80e ect. eventual donor for the above
http://www.youtube.com/watch?v=KmB2y7uX38I
04-06-2006 #6got the coilover hardware in today, and finished the fuel cell. Overall im not to happy with the welds because i know they could be better but atleast it holds water.
68 Camaro - never to be finished
06 Silverado - Forged 370, L92 Heads, big cam, 4l80e ect. eventual donor for the above
http://www.youtube.com/watch?v=KmB2y7uX38I
04-06-2006 #7





Reply With Quote