Enter your username:
Do you want to login or register?
  • Forgot your password?

    Login / Register




    Results 1 to 12 of 12

    Hybrid View

    1. #1
      Join Date
      Aug 2014
      Location
      Missouri
      Posts
      153
      Country Flag: United States
      Quote Originally Posted by dontlifttoshift View Post
      I find the 60fc number is for general shop lighting with the intention to use task lighting everywhere. It's a business and I think that plan sucks. There's a work light on the band saw, we don't even turn it on anymore.

      All lighting layout was done without thinking about the doors. If the doors are open, there is sunlight, nighttime lighting with the doors open isn't a concern for me.



      I mostly 8', 4 bulb fixtures with a handful of 4' fixtures to get around garage door tracks and other things already on the ceiling.

      Hot tip, make sure to enter inside dimensions in the lighting calculator.
      Yes, walls take up a foot total of that space.
      Deep down A part of me still wants to do the 16x wide beam UFOs, and have dropped down lighting that is maybe 8ft off the ground on the side where the work bench would be for detail work. Will play around with calculators more later tonight.





    Advertise on Pro-Touring.com