Results 1 to 20 of 93
Thread: 1966 Nova SS Build
Hybrid View
-
02-28-2020 #1
Cabin Work: Floor Pans and Front Frame Rails
The old frame rails:
Look closely and see all the spotwelds that were not holding
-
02-28-2020 #2Repairing The Frame Rails
Repairing the frame rails.
Left side is in. Right side is cut out. New frame piece for right side can be seen in center of first pic sitting on the square tube. Bottom pic is the left rail welded in place
Right side rail fitted and clamped in place ready to be welded.
Next pic is welded in place
02-28-2020 #3Cabin Floor Pans
The floor pans still need more fitting and trimming before they get welded in place, but you get the idea of how they look and are fitting so far.
03-01-2020 #4





Reply With Quote