Results 1 to 20 of 168
Thread: 1972 C10 Build
Hybrid View
-
10-26-2016 #1
I got my fuel cell from boyd welding, I fixed the stripped studs on the rear axles, replaced my body mounts, got my front upper shock mounts and took the bed off so i can start taking some of the riveted frame pieces that i don't need then i can take the truck to the fabricator in a couple of weeks to get the suspension and brakes finished. Then i can start wiring the truck and get working on the engine and transmission.
-





Reply With Quote



