      Finished of the OSB sheeting this weekend and Sturgis Overhead Door came out to measure the opening for that. They should have it installed within the next 2 weeks. I believe the entry doors and windows will be arriving this week. The conduit is run for electrical and Ethernet. Minimal amount of house wrap to finish up and we'll move on to the electrical work inside. It's been a long haul this year, but I've always believed that you should never hire out a job that you are capable of doing yourself. It may take a little longer, but I've always taken pride in my accomplishments.

      Attached Images Attached Images      
      -Mike