SIK02SS
09-09-2011, 02:02 PM
The car's been "finished" since 2005, but I was never very happy with how the engine bay turned out, so I decided it was time to make some changes while I had it at the shop to re-tune the carb and have the calipers sent back to Wilwood for a rebuild.
The shopping list:
Ron Davis radiator
SPAL 13" fans
Vintage Air Serpentine
AC evaporator
Master Cylinder
Headlights
Fuel distribution line to carburetor
Valve covers
Other to-do's:
Re-wire engine bay (new wire + hide wires)
Adjust and relocate choke cable
Upgrade headlight wiring
Re-plumb AC
Match all hoses and looms
Remove windshield washing fluid reservoir/lines/spray nozzles :lol:
Before:
https://static1.pt-content.com/images/pt/2007/09/DSC01738-1.jpg
https://static1.pt-content.com/images/pt/2011/09/DSC01760-1.jpg
https://static1.pt-content.com/images/pt/2007/09/DSC01741-1.jpg
https://static1.pt-content.com/images/pt/2007/09/DSC01734-1.jpg
https://static1.pt-content.com/images/pt/2011/09/45659649017843173784-1.jpg
https://static1.pt-content.com/images/pt/2011/09/23257308421268632119-1.jpg
Progress:
https://static1.pt-content.com/images/pt/2011/09/09663183173859607924-1.jpg
https://static1.pt-content.com/images/pt/2011/09/13342056209629900958-1.jpg
Vintage Air Serpentine
https://static1.pt-content.com/images/pt/2011/09/96115811288092735684-1.jpg
https://static1.pt-content.com/images/pt/2011/09/91551544975185506573-1.jpg
New master cylinder sans booster
https://static1.pt-content.com/images/pt/2011/09/00755521829419821668-1.jpg
New headlights and upgraded wiring
https://static1.pt-content.com/images/pt/2011/09/30907296506281857397-1.jpg
https://static1.pt-content.com/images/pt/2011/09/40427405181859497391-1.jpg
https://static1.pt-content.com/images/pt/2011/09/31226046481999172034-1.jpg
https://static1.pt-content.com/images/pt/2011/09/65836551306358682307-1.jpg
Once this project is done, next up is selling the wheels/tires and getting some 18s put on :cheers:
The shopping list:
Ron Davis radiator
SPAL 13" fans
Vintage Air Serpentine
AC evaporator
Master Cylinder
Headlights
Fuel distribution line to carburetor
Valve covers
Other to-do's:
Re-wire engine bay (new wire + hide wires)
Adjust and relocate choke cable
Upgrade headlight wiring
Re-plumb AC
Match all hoses and looms
Remove windshield washing fluid reservoir/lines/spray nozzles :lol:
Before:
https://static1.pt-content.com/images/pt/2007/09/DSC01738-1.jpg
https://static1.pt-content.com/images/pt/2011/09/DSC01760-1.jpg
https://static1.pt-content.com/images/pt/2007/09/DSC01741-1.jpg
https://static1.pt-content.com/images/pt/2007/09/DSC01734-1.jpg
https://static1.pt-content.com/images/pt/2011/09/45659649017843173784-1.jpg
https://static1.pt-content.com/images/pt/2011/09/23257308421268632119-1.jpg
Progress:
https://static1.pt-content.com/images/pt/2011/09/09663183173859607924-1.jpg
https://static1.pt-content.com/images/pt/2011/09/13342056209629900958-1.jpg
Vintage Air Serpentine
https://static1.pt-content.com/images/pt/2011/09/96115811288092735684-1.jpg
https://static1.pt-content.com/images/pt/2011/09/91551544975185506573-1.jpg
New master cylinder sans booster
https://static1.pt-content.com/images/pt/2011/09/00755521829419821668-1.jpg
New headlights and upgraded wiring
https://static1.pt-content.com/images/pt/2011/09/30907296506281857397-1.jpg
https://static1.pt-content.com/images/pt/2011/09/40427405181859497391-1.jpg
https://static1.pt-content.com/images/pt/2011/09/31226046481999172034-1.jpg
https://static1.pt-content.com/images/pt/2011/09/65836551306358682307-1.jpg
Once this project is done, next up is selling the wheels/tires and getting some 18s put on :cheers: