Results 1 to 10 of 10
-
05-29-2005 #1
Registered User
- Join Date
- May 2005
- Posts
- 4
Chicane67 --have dacron, now what!
Chicane67 posted this a ways back on a different forum and I'm ready to try it out. Floorpans scrubbend and POR-15'd, seam sealed and starting on the Fatmatting. Yesterday we bought around 20yds of Dacron batting and are ready to start stuffing it into the areas mentioned above.
Originally Posted by chicane67
What area is considered the b-pillar? when you say to stuff and not layer the headliner --did you have any lumpy headliner problems afterward? Is it supposed to be fluffy in there or packed in tightly? The headliner is out now and I was thinking of stuffing the areas on the side that the headliner bows stick into. --rather /everything/ is out now and I don't want to miss an area. Cram and Jam, or leave it "poofy" like fiberglass insulation in the walls of a house?
Thanks in advance!
Aaron



Reply With Quote