Enter your username:
Do you want to login or register?
  • Forgot your password?

    Login / Register




    Results 1 to 1 of 1
    1. #1
      Join Date
      Jan 2013
      Location
      ST George UT
      Posts
      1,093
      Country Flag: United States

      1969 Camaro DSE Roller project

      PLEASE REMOVE

      CA clean title v8 car. [/COLOR]
      Car was stripped to bare metal.
      -DSE mini tubs installed.
      -DSE weld in sub frame connectors installed.
      -DSE powder coated sub frame installed.
      -Fully smoothed firewall.
      -Rear spoiler welded on and laid back.
      -All side marker lights and trim welded up.
      -Drip railer shaved.
      -Rear bumper is pocketed into body and frenched.
      Body has been professionally gaped and body worked, block and primed 3 times. Looks amazing, ready to pick your color.
      I even had the body shop, body work and clean up all jams of hood, fender and doors for a show finish paint job.
      All sheet metal is aligned to paint stick gaps and bolted on the car.




      Now for parts included:
      SUSPENSION:
      -DSE powder coated complet sub frame. (Installed)
      -DSE quadra link rear suspension. (Installed)
      -DSE narrowed complete 12 bolt rear end with true trac 3:73. (Installed)
      -DSE rear sway bar. (Installed)
      -DSE weld in sub frame connectors. (Installed)
      -DSE mini tubs. (Installed)

      All sheet metal is bolted on and professionally aligned.
      NO engine, no trans, no brakes, no interior.
      Just a complete DSE 69 Roller. Body work is truly ready for paint. Just got it out of the body shop, been there 2 years and cost 18k in body work.

      PLEASE REMOVE POST

      Location is Santa Cruz CA




    Advertise on Pro-Touring.com