Results 1 to 13 of 13
Thread: Bendpak lift
-
11-05-2018 #1Registered User
- Join Date
- Nov 2018
- Location
- Winston Salem, NC
- Posts
- 94
Bendpak lift
Building an extra bay for the lift.
- - - Updated - - -
Bendpak 10AS delivered
- - - Updated - - -
Extra depth concrete to approximately 18-20" in depth. Rebar and wire was also used here
- - - Updated - - -
Slab poured
-
11-05-2018 #2Registered User
- Join Date
- Nov 2018
- Location
- Winston Salem, NC
- Posts
- 94
Used 10" 304 stainless dowels epoxied in, instead of the 4" that came with the lift. We also braced it off at the top to the trusses in the ceiling.
- - - Updated - - -
Setting it all up
-
11-05-2018 #3Registered User
- Join Date
- Nov 2018
- Location
- Winston Salem, NC
- Posts
- 94
Almost done
-
11-05-2018 #4Registered User
- Join Date
- Nov 2018
- Location
- Winston Salem, NC
- Posts
- 94
- - - Updated - - -
This lift is probably one of the best investments I've ever made. FWIW
-
11-06-2018 #5