Attachment 143382 Final rendering of Street version, Should take 3 to 4 hours to convert from street version spoiler/wing to track splitter/wing. Off to the Body guy within the next couple of weeks.
Printable View
Attachment 143382 Final rendering of Street version, Should take 3 to 4 hours to convert from street version spoiler/wing to track splitter/wing. Off to the Body guy within the next couple of weeks.
Started running the SS lines. Still have to tweek a bit
Working on firewall and transmission tunnel
The stainless lines look good. The firewall is looking good too.
Who makes those black clips holding the stainless lines to the chassis?
NotcHead - DSR Fasteners | Parts, Tools & Accessories
http://www.notchead.com
Attachment 146347Attachment 146345Attachment 146346Attachment 146348Attachment 146349Finished fitting the tunnel and floor, firewall and dry sump tank
Attachment 146840Attachment 146841Attachment 146842Attachment 146843 Started working on shaving the drip rails
Beautiful work. I'm always excited to see updates on your car.
enjoying this build!looking forward to hearing it fireup,regards
That floor looks amazing! Awesome job with the sheet metal fab-keep up the good work!
Looks great. What fittings did you use with the SS lines at the firewall ?? I would like to do something similar for my power steering. I'm not sure the compression fittings can hold more than 150 PSI though. Thx
Attachment 147377Attachment 147378Attachment 147379Attachment 147380Attachment 147381Attachment 147382Attachment 147383
We are using alu AN flared fittings on the low pressure side of the pump. Still trying to find the correct SS fittings for the high pressure side of the pump. (just not comfortable using alu nuts on the high pressure side although we will test all the lines/fitting to make sure we don't have a leaks prior to engine start up.)
Finished up welding and grinding welds on the tunnel area. Had to modify the trans brace to make room for the gear vendor OD unit and access nuts . Finished most of the work on the drip rails (got a couple small areas to fix where the lead that melted out)
Hope to install the mock up motor for the last time (before fore going to paint) and finish making up the rest of the SS lines, install wheel tubs, fuel tank etc
Gottashow products should have those. http://gottashow.com/
Attachment 147603Attachment 147604Attachment 147605Attachment 147606Attachment 147607Attachment 147608 Finished fitting wheel tubs, Continuing finishing lines and installing accessories within the engine compartment
Attachment 148121Attachment 148122 Started working on air condition lines. Have to drill thru the radiator support and seal weld the tube to the support and seal weld the male fittings to the support. Should make it clean and allow it to be removed
I'd give my left nut for one of those intakes by shaun! great work on this
Installing rear pannels, making template for fuel tank slimjim; shawns products are secound to none getting ready to order valve covers, timing cover and valley cover.