jr421
06-16-2010, 10:59 AM
I am building a 69 camaro and was wondering how long of a lead time I should allow for delivery of the following parts:
G-Link rear suspension
Narrowed Fabrictated 9 inch housing with axles and bearings.
13 inch Wilwood fronts with 12" wilwood rears
GM 600 powering sterring box
I would like to have the car ready to ship to the painter by September which is a tight schedule considering I have a day job. Any idea of allowable delievery times is greatly appreciated.
thanks
G-Link rear suspension
Narrowed Fabrictated 9 inch housing with axles and bearings.
13 inch Wilwood fronts with 12" wilwood rears
GM 600 powering sterring box
I would like to have the car ready to ship to the painter by September which is a tight schedule considering I have a day job. Any idea of allowable delievery times is greatly appreciated.
thanks