PDA

View Full Version : Delivery Times for the following Parts



jr421
06-16-2010, 10:59 AM
I am building a 69 camaro and was wondering how long of a lead time I should allow for delivery of the following parts:

G-Link rear suspension

Narrowed Fabrictated 9 inch housing with axles and bearings.

13 inch Wilwood fronts with 12" wilwood rears


GM 600 powering sterring box


I would like to have the car ready to ship to the painter by September which is a tight schedule considering I have a day job. Any idea of allowable delievery times is greatly appreciated.


thanks