datsbad
02-02-2005, 08:38 AM
Hey guys, just wanted to drop a line and say check out the projects .
WWW.GFORCEDESIGNCONCEPTS.COM
go to gallery and current projects .
The 67 has been started on and is going to media blast next week , then back for the IFS front suspension. should be going to paint in about a month . i am still trying to land a 03/04 supercharger cobra motor. any leads on one plese email me or pm .
66 fastback is having the t5 trans installed
72 chevele is about done , waiting for valve covers and some detailing.
we just finished up putting in 2 front floor pans in the 70 nova and the ls1 in sitting on the stand awaiting is camshaft and harness from speartech to get this thing going.
some plans changed on the convertible and i am installing a whole new firewall section . the remote mount brakes are not going through .
any questions send me some emails , thanks
WWW.GFORCEDESIGNCONCEPTS.COM
go to gallery and current projects .
The 67 has been started on and is going to media blast next week , then back for the IFS front suspension. should be going to paint in about a month . i am still trying to land a 03/04 supercharger cobra motor. any leads on one plese email me or pm .
66 fastback is having the t5 trans installed
72 chevele is about done , waiting for valve covers and some detailing.
we just finished up putting in 2 front floor pans in the 70 nova and the ls1 in sitting on the stand awaiting is camshaft and harness from speartech to get this thing going.
some plans changed on the convertible and i am installing a whole new firewall section . the remote mount brakes are not going through .
any questions send me some emails , thanks