I have some pictures of the one i just did . if you want to e-mail me direct i can send them to you.
[email protected]
my site attachment area is full right now!
WHAT I DID -
i used 1x1 square tubing and some angle iron.
1) for the door jam areas ( I also use when on the rotisserie) - take a 4" sect of 2x2 angle and drill holes so you can bolt to where the door hinges bolt up ( TOP HINGE IS WHAT I PREFER) / Bolt it up , take a length of 1x1 sq and weld one end to the center of the angle iron and one end to the pinch weld on the door jam area....( REPEAT FOR OTHER SIDE ).
2) i put a 1x1 sq tube from side to side JUST 3" under the dash .
3) 1x1sq UNDER THE CAR AT THE ROCKER/FLOOR PINCH WELDS - 1 at the rear just in front of the frame rails and 1 in front aprox. 10" back from the hinde posts ( About in linewhere the shifter would be ).
NOW I DONT KNOW HOW EVERONE IS DOING IT BUT I HAVE BEEN TOLD THAT THE FLOOR HAD TO GO IN THROUGH THE FRONT WINDHIELD AREA....I COULD GET IT TO DROP IN DUE TO THE DASH BEING IN THE WAY.....
I Finally went in through the bottom and it was a Breeze ..slide in from the front up to the rear window area till the front cleared and then it dropped right in place.
I clamped it in place at the rockers for a test fit , and used some 1/4-20 bolts place in a number of stratigic palces to pull it into place for a tight fit and the released the rocker clamps to adjust and reclamp for welding...